top of page
Vídeo sem título (1).mp4

Logistics efficiency with a global standard for your Project Cargo at the Port of Rio de Janeiro

Member of the ICTSI Group, Rio Brasil Terminal links Brazil to the globe through secure, efficient, and sustainable solutions

Get in touch and download our material

Partner with our port logistics experts now

Fill out the form to secure efficient cargo handling and discuss custom solutions with our commercial team

Optimized layout

Large dedicated yard areas for oversized and special cargo

In-house team of highly specialized staff

Ensuring operational quality and safety

Rio Brasil Terminal features a modern and versatile infrastructure, engineered to handle diverse cargo profiles with efficiency, safety, and speed. With dedicated zones, specialized resources, and integrated operations, the terminal ensures greater control, productivity, and predictability across all logistical processes

Infrastructure designed for efficient and secure operations

Infrastructure designed to eliminate bottlenecks

Capable of adapting flawlessly to specific customer demands

Operational flexibility

Our terminal is designed to minimize congestion,  eliminate operational constraints,  and ensure efficient cargo flow

Results that drive real difference

WaITING TIME TO BERTH

ICTSI

ESG

EFFICIENCY

1h 54m

Among the fastest vessel berthing times in Brazil (2025 YTD - ANTAQ)

33 terminals in 19 nations

Expertise and a global footprint

Sustainability as a competitive advantage

First port terminal on the East Coast of South America to achieve Carbon Neutral certification

Nature Partner certification

GHG Protocol Gold Seal

Customs & Logistics

  • In-house Brazilian Customs
  • Streamlined DTA and DTA-S processes
  • Full regulatory licensing
  • Multimodal integration
  • 24/7 Surveillance
  • ANVISA, MAPA and Brazilian Army Licenses
  • ISPS Code 
  • ISO 9001 
  • ISO 14001 

Various cargo types

Industrial components, coils, offshore gear, and more

DSC01916.JPG

Dedicated space

Focused on storage for complex project cargo

Cópia de DJI_20260422102855_0988_D.JPG

Break Bulk & Project Cargo

Experts in high-complexity operations, Rio Brasil Terminal offers dedicated infrastructure and a qualified staff for specialized project shipments

Alliances

Strategic partnerships with specialized shipowners

DJI_0348 (1).JPG

Berth and assets

Berth with on-demand operational flexibility and STS cranes with lifting capacity up to 80 tons

3 navios (2) (1).jpg
bottom of page